Please use this identifier to cite or link to this item: https://hdl.handle.net/10321/4492
DC FieldValueLanguage
dc.contributor.authorDewa, Mendonen_US
dc.date.accessioned2022-11-07T06:48:56Z-
dc.date.available2022-11-07T06:48:56Z-
dc.date.issued2022-10-03-
dc.identifier.citationDewa, M. 2022. Optimisation of a flexible manufacturing system through the application of greedy knapsack heuristic. Proceedings of the 33rd Annual Southern African Institute of Industrial Engineering Conference. Presented at: 33rd Annual Southern African Institute of Industrial Engineering Conference: 517-525 (9).en_US
dc.identifier.issn2308-8265-
dc.identifier.urihttps://hdl.handle.net/10321/4492-
dc.description.abstractThe global manufacturing industry is currently facing intense competitive pressure that requires better efficiency, effectiveness and continuous improvement of the manufacturing systems. Production planning in flexible manufacturing systems is crucial for the efficient organisation of production resources to ensure economic effectiveness and meet schedule requirements without violating capacity constraints. The objective of this paper is to develop a cost-effective assignment of parts to a flexible manufacturing system (FMS) through the application of Greedy Knapsack heuristic. A production-planning problem was formulated, the objective function and associated constraints were stated and an Excel based tool was developed to generate solutions Greedy Knapsack heuristic. The tool would assign the best selected parts to the semi-automated FMS in an optimal manner to the production plan. The sample computational results were presented for Greedy Knapsack heuristic, and conclusions were drawn for the flexible manufacturing system.en_US
dc.format.extent9 pen_US
dc.language.isoenen_US
dc.publisherSouthern African Institute for Industrial Engineeringen_US
dc.relation.ispartof33rd Annual Southern African Institute of Industrial Engineering Conferenceen_US
dc.subjectFlexible manufacturing systemen_US
dc.subjectGreedy knapsack heuristicen_US
dc.subjectOptimisationen_US
dc.titleOptimisation of a flexible manufacturing system through the application of greedy knapsack heuristicen_US
dc.typeConferenceen_US
dc.date.updated2022-10-20T16:27:18Z-
dc.publisher.urihttp://www.saiie.co.za/publicationsen_US
dcterms.dateAccepted2022-10-3-
local.sdgSDG09-
item.languageiso639-1en-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.cerifentitytypePublications-
item.openairetypeConference-
item.grantfulltextopen-
item.fulltextWith Fulltext-
Appears in Collections:Research Publications (Engineering and Built Environment)
Research Publications (Engineering and Built Environment)
Files in This Item:
File Description SizeFormat
Dewa_2022.pdfArticle196.22 kBAdobe PDFView/Open
SAIIE Copyright Clearance.docxCopyright Clearance194.12 kBMicrosoft Word XMLView/Open
Show simple item record

Page view(s)

265
checked on Sep 13, 2024

Download(s)

132
checked on Sep 13, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.